Cleaning and Degreasing of Transmissions

Project specifics

A company specializing in the reconditioning of transmissions turned to MecanoLav to design a washing tunnel for heavily soiled drive shafts.

The objectives were to ensure a production rate of 320 baskets in 8 hours and to process up to 450 kg of fat per day.

Production Performance and Efficiency

The tunnel operates in four stages: pre-wash, wash, rinse, and dry.

The chain conveyor with adjustable speed adjusts the processing time. Hot-air knife drying allows the parts to be sent directly to the shot blasting process.

The output reaches 320 baskets in 8 hours in a continuous process.

Washing tunnel with 4 access hatches

Treatment of Severe Contamination

High-pressure washing, using pumps with a flow rate of 1,500 L/min at 7 bar, removes heavy grease.

Three 2,500-liter tanks ensure a gradual cleaning process, while three degreasers remove heavy grease deposits.

3 degreasers in a washing tunnel